April 1st  Secured ELT wiring, Installed A210, 320A, music jack, starter button, and Enigma

April 2nd  Intercom install, Hobbs, left side air vent, started running wires

April 3rd  Music jack, FWF wire pass thru, pilot mic and phone jacks

April 4th  Co-pilot jacks and PTT, Enigma RDAC intsall

April 5th  Intercom install, AOA, Traffic, compass, More Enigma wiring, I/O Extender, LED caution lights

April 6th  I/O Extender install, shunt install, sub-switch panel (remade)

April 8th  Installed sub-switch panel stuff, 295 panel dock install, main switch panel

April 10th  Started switch wiring, remade switch panel, redid switch wiring

April 11th  Fuel pump, compass, E-buss, alternator wiring, AHRS routing

April 14th  Fusible link for alternator feed, redid E-buss wiring

April 15th  Installed remaining switches, ran pilot PTT, OAT, and compass magnetometer

April 19th  Finished compass wiring, installed mag, wired the shunt

April 20th  Starter and battery solenoid switch wiring, starter engaged LED

April 22nd  Recognition light/Wig-wag circuit, baggage lighting

April 25th  Baggage lights, mounted tail feathers, compass magnetometer

April 26th  Baggage light wire runs, installed switch

April 27th  Finished baggage lighting install

April 28th  Finished VS bolts, prop extension...not so much

April 29th  Power wire for AHRS, started tidying up wire bundles

April 30th  LSI wiring, remade the DB15 connector for the brain box

 