chadandbrittne.com

 

Home

Brittne's Page

The Tailwind

The RV-7

Wiley

Yeager

Lindy

Wiley & Yeager

Other Stuff

Links

email

April 2010

April 1st  Pre-oiled the engine, added oil, installed bottom plugs, panel labels

April 3rd  Installed pitot tube, phased LSI, right side cover, set flaps to 40

April 7th  Installed fuel selector plate and lever, added some gas, Enigma set up

April 10th  FIRST ENGINE START!!

April 11th  Fixed the oil leak at the firewall manifold transducer

April 13th  Oil pressure trouble shooting

April 14th  Ran engine to verify oil pressure, set mixture and idle, checked ignitions

April 16th  Swapped CHT/EGT wires, fixed fuel pump caution light

April 17th  Started installing the oil door, lower empennage fairing

April 18th  Oil door, rear empennage fairing, inspection covers

April 21st  Oil pressure sender, oil door

April 28th  Cowl pin firewall pass thru

April 29th  Cowl pin interior side

April 30th  Air inlet tube, Hobbs power, fuel line fuselage entry seal

 

May 2010

March 2010

RV-7 Home