8/26/2007 Fairly quick work day this morning. I finished up the fuel tank vent line install on both sides, starting with the inside left line.
I decided to just bend the tubing per plans near the bottom (rather than a 90 fitting as I had to do on the other side) on this side only because it was easier. Then I did the outside lines. These are short runs with several bends in them to get around the fuel supply line on the left side, and the tank attach bracket on both sides. Here's the left side.
Another view showing how it curves over the line and bracket.
And here is the right side.
That's pretty much it, except the wing root fairings (which should be here by the end of the week or so). Hopefully, if all goes well, I'll be removing the wings over the Labor Day weekend! 2.0 hours |