August 2007 Fuselage August 12th Rearranged the garage to fit the wings August 13th Panel update, angle of attack gauge arrives August 15th Wings mated! August 18th Set incidence, drilled rear spar, started flap install August 19th Finished right side flap actuator hole, connected right flap August 20th Left side flap actuator tube hole, connected L flap, started connecting ailerons August 21st Hooked up right aileron, started to figure out the flap notch arm install August 22nd Flap notch arm fitting, drilled tunnel cover for notch arm and doubler August 23rd Dimpled and painted tunnel cover/doubler, drilled tank attach angle August 25th Finished flaps, started fuel and vent line routing August 26th Finished fuel tank vent lines August 27th F-721B forward side brace August 28th Riveted F-721B's August 29th Wing root fairings (no pics) August 31st Finished fuel lines, fit F-785A center brace for F-705 bulkhead
|