|
|
| Home |
2/3/2010 First off tonight, I worked on cutting the front rod end bearing from the steering link since I striped the threads the other night. I used a cutoff wheel in the Dremel, and it was off in less than five minutes.
Then I went to work on the crotch strap kit. First I made the flange extensions from some scrap metal off another airplane...
Then after some measuring and drilling, I riveted them to the right side brackets.
What a pain in the ass these are to get drilled in to the floor when the airplane is already built...would have been MUCH easier to do way back when I built the center section. This part REALLY sucked, and I have to do it all over again for the left side...
I used a .125 shim, as noted in the plans, to get the spacing right for the belts.
There is still a lot to do on this side, but I think I'll go ahead and get the left side to this point next time to get the crappy part done. 2.75 hours |