|
|
|
Home
Lindy |
2/6/2010 Had a couple of hours to work on the airplane this afternoon before we head to a charity bowling event tonight. Glamorous, I know... All I did this afternoon was drill the left side crotch strap bracket up to the point of where the right was was. That meant riveting the flange extensions on first, then positioning and drilling...
Then I took both sides to #30 holes for the LP4-3 blind rivets that will be used to install them.
I think the hard part is over...today sucked as well getting in to position to drill this stuff. We'll see how the riveting goes... 2.0 hours |