|
|
| Home |
7/17/2006 I'm trying to beat the heat around here, so time in the shop is limited. I spent a half hour out there tonight setting the rivets at the aft end of the leading edges with the squeezer. These turned out great, as is expected from the pneumatic squeezer.
0.5 hours |