|
|
| Home |
July 2009 End Game July 1st Bottom cowl fitting and trimming July 2nd Last trim on the top cowl, sanding July 3rd Bottom cowl fitting July 5th Finished fitting cowl July 6th Riveted hinges to bottom cowl July 7th Riveted side hinges to FW, fixed gap on the bottom cowl July 8th Removed bottom cowl, checked top/bottom fit, c-sunk rivet holes in top cowl July 10th Bottom cowl lower fastener tab July 11th Bottom cowl lower fastener tab, opened induction hole on cowl July 12th Front cowl joint, primer lines July 15th Riveted hinges to top cowl, re-secured primer lines the proper way July 20th Front cowl joint, empennage tips, aileron stops July 22nd Front cowl, started hooking up control surfaces July 24th Magnetometer mount, front cowl tab trimming July 25th Put wingtips on, front cowl tabs July 26th Oil door, started inlet rings
|