6/18/2007

I'll get to building (what little I did...) in a minute.  This past weekend, I managed to get the wings hung on my walls in the garage.  This was a MUCH BIGGER job than I had anticipated, but it's done.

Building tonight was limited due to several interruptions.  I started by setting the seat pans and baggage pans in place.  For what I don't know yet, but it seemed logical that I'll need to get in there at some point.

Then I turned to the elevator bellcrank, and the bearing that is riveted in between.

I didn't take a pic of it, but I fit the bellcrank in the fuselage and made sure the spacers fit with no play.  They did, and I removed them, and put them aside for now.

Then I found the F-656 bulkhead gussets, cleco'd them in place and drilled them to the 706 and 707 bulkheads and longerons.

There are two per side, and after drilling, I deblued and deburred these.  I hope to get them primed and riveted tomorrow.

1.0 hour