|
|
|
Home
Lindy |
6/30/2007 Today I got to install a couple of parts! I started with the rear baggage side skins. These are pretty straightforward with solid rivets and blind used.
Next I installed the baggage floors. These are somewhat of a pain to do, only because after the blind rivets are installed, I pretty much had to lay down to get the solid rivets squeezed.
The front most row is shared with the rear seat pans, so they are left open for now. As a note, one of the inner platenuts next to the tunnel on the 706 bulkhead needed to be ground down just a bit to fit.
That wraps up June 2007! 3.0 hours |