June 2007 Fuselage

June 2nd  Tipped the canoe!!

June 3rd  Leveled fuselage fore and aft/side to side, drilled 714 aft deck to longerons

June 4th  Riveted aft deck to longerons, fixed a rub on the 706 bulkhead

June 6th  Riveted F-709 bulkhead to aft deck, made trims on side rails

June 7th  Finished F-721B trims, made one F-757T

June 10th  Finished F-757T's, made F-695 gussets, fit F-636 seatbelt anchors, started F-635 bellcrank

June 11th  Drilled F-635 bellcrank holes to final size, made F-635C bushings

June 13th  Riveted F-757T's, F-721B side rails, and F-695 gussets

June 14th  Brought wings back home, riveted F-728B to F-728A channel, and riveted it in place

June 15th  No building today, but I got my tires and tubes, and I played panel maker, for real...sort of

June 18th  Riveted bearing to elevator bellcrank, drilled bulkhead gussets

June 19th  Finished riveting the 706 center brace, riveted F-656 gussets, fit rear top skin

June 23rd  Drilled rear and forward top skins in aft fuselage

June 24th  Finished drilling skins, deburred, dimpled skins and structure

June 26th  Drilled and dimpled forward top skin, installed rudder cables

June 27th  Remade top J stringers

June 28th  Dimpled top J stringers, cleco'd top skins back on

June 30th  Installed rear baggage side skins and baggage floors

 