June 2009 End Game June 2nd Catto Prop is here!! Right flap hinge pin, started polishing bottom right wing June 4th Polishing June 6th Polishing June 8th Polishing June 10th Polishing June 11th Finished polishing...for now June 12th Wings mated for good!! June 15th NAS1307-50 close tolerance bolts June 16th CT bolts/nuts, rear spar bolts/nuts June 17th Sheer bar bolts, hung prop, started cowl June 20th Fit top cowl, test fit bottom cowl June 21st 1304 CT wing bolts, fuel pump to gascolator line, tank attach work June 22nd Tank attach brackets June 24th Tank attach brackets and bolts, started cowl hinge pin June 25th Torque'd wing bolts, cowl hinge June 27th Top cowl fit and drilled, started bottom cowl June 28th Refit and redrilled the top cowl hinges, bottom cowl June 29th Measured top cowl, airplane for level, drilled vertical bottom cowl hinges
|