|
|
| Home |
3/3/2004 All I had time to get to today was to finish getting the J channels located and drilled every fourth hole. Here you can see the J channel lines are cleco'd.
Then I removed the 712 bulkhead to bend the flanges to match the angle of the taper of the skins. I also flanged the 711 bulkhead, but did this without removing it.
1.5 hours |