March 2009

March 1st  Finished the audio harness, installed the Molex connector

March 2nd  A210 antenna, switch wiring, diode wiring

March 4th  Wired the batt/alt switch, re-wired Icom Molex connector, started disassembly

March 7th  Reinstalled tail wheel, fixed Icom power wire pin, finished panel disassembly

March 8th  Back to work on the baffles

March 9th  Baffles, trial fit of the plenum

March 16th  Battery bus installed, ANL current limiter and diodes installed

March 17th  Ran alternator power and main bus power

March 18th  500hr inspection on the mag, misc. firewall wiring, started fuse block hinge plate

March 21st  Panel reinstalled, fuse block hinge

March 22nd  Finished fuse block hinge plate, started air vents

March 23rd  Pax air vent, mounted fuse blocks, mic/phone jacks, misc.

March 26th  Painted the panel

March 28th  Aux. fuel pump, elevator trim knob, primer pump, installed panel

March 29th  Secured FWF brake lines, started thinking about ELT locations

March 30th  ELT install

 