chadandbrittne.com

 

Home

Chad's RV-7

Brittne's Page

Wiley

Yeager

Wiley & Yeager

Other Stuff

Links

email

5/7/2006

Pretty big day today, but not a whole lot to show for it!  I started by drilling all the ribs to the leading edge, and then re-hung the plumb bobs.  Then I used the Unibit (need to get a new one, this one sucks!) to drill the whole to final size for the tie down eye bolt.  I need to tap those a little farther to get it in the rest of the way.

Took a break for lunch, then I started on the fuel tanks.  I decided, like the rest of the RV world, to use Dan Checkoway's method of installing the Z brackets.  He does make it much easier than Vans instructions.  I de-blued the inside of the R skin and began clecoing the ribs in place.  

This was actually much easier than I thought it was going to be.  I used a cheap little awl from Sears to line the holes up, and voila!  Here's the right tank with the baffle cleco'd in place.

Then I drilled the 3/16" hole in the center of each Z bracket.  Here they are lined up ready for the drill.

After they are all center drilled, they were bolted to the spar to drill the outer holes to #12.

The left skin is waiting in the second cradle that I built to have the ribs cleco'd in tomorrow.

4.25 hours

Previous  Next  Index  RV-7 Home