chadandbrittne.com

 

Home

Brittne's Page

The Tailwind

The RV-7

Wiley

Yeager

Lindy

Wiley & Yeager

Other Stuff

Links

email

5/4/2007

I didn't get a whole lot of time today to work on the airplane, but I did get something done.  I started by clecoing and drilling the aft baggage side skins to the ribs.

Then I drilled the F-724 vertical ribs to the longerons and 623 floor ribs.

After that was done, I took a look at the instructions, and determined that before I start the "laundry list" of things to do before starting riveting, that I needed to finish out some drilling of the skins.  I got it all done except the bottom forward skin to the lower firewall.

1.5 hours

Previous  Next  Index  RV-7 Home