|
|
|
Home
Lindy |
May 2010 May 1st More Enigma set up, started messing with gear leg fairings May 2nd Gear leg fairings May 5th Started empennage fairing filler May 9th Sanding and filling May 12th Sanded wingtips, installed the plenum & bottom cowl May 14th Inlet ring to plenum tubes May 15th Inlet tubes done, oil temp solved, cowl on, painted canopy over the roll bar May 19th Gear leg fairings May 22nd Installed gear leg fairings, Koger sun shade, long engine run and 1st taxi May 23rd Misc. engine stuff, empennage fairings, started the SJ wheel pants May 26th Taxi with Enigma test, right wheel pant May 29th Secured the elevator trim tab May 30th Emp tip sanding May 31st Oil door latch
|