chadandbrittne.com

 

Home

Brittne's Page

The Tailwind

The RV-7

Wiley

Yeager

Lindy

Wiley & Yeager

Other Stuff

Links

email

May 2010

May 1st  More Enigma set up, started messing with gear leg fairings

May 2nd  Gear leg fairings

May 5th  Started empennage fairing filler

May 9th  Sanding and filling

May 12th  Sanded wingtips, installed the plenum & bottom cowl

May 14th  Inlet ring to plenum tubes

May 15th  Inlet tubes done, oil temp solved, cowl on, painted canopy over the roll bar

May 19th  Gear leg fairings

May 22nd  Installed gear leg fairings, Koger sun shade, long engine run and 1st taxi

May 23rd  Misc. engine stuff, empennage fairings, started the SJ wheel pants

May 26th  Taxi with Enigma test, right wheel pant

May 29th  Secured the elevator trim tab

May 30th  Emp tip sanding

May 31st  Oil door latch

 

June 2010

April 2010

RV-7 Home