|
|
|
Home
Other Stuff-NEW! |
November 2007 Fuselage November 3rd Sub-panel structure November 4th Fit panel to the sub structure November 5th Rearranged instruments a bit, started aileron trim install November 6th Drew layout of the panel November 7th Manual aileron trim November 8th Finished aileron trim, started forward elevator push-pull tube November 9th Installed forward elevator push-pull tube, drilled F-697 "hat section" to sub-panel November 10th Fixed forward push rod problem, sub-panel work November 11th Reinstalled sub panel, put platenuts in the 704 side covers, finished panel design in AutoCAD November 14th Cut panel, modified left panel rib, fit some instruments November 17th Cut hole in sub-panel for A210, installed vent scoops, push tube thread safety November 18th Fiddled around with the fuel selector, found new location for power supply November 20th Fuel valve install, relocated strobe power supply November 21st FINISH KIT ORDERED! Redid fuel lines to selector with a union November 23rd Made the aux fuel pump doubler November 25th Installed aux fuel pump doubler, covered fuselage for winter
|