October 2nd  Made engine ground, battery negative ground, and starter power wires, installed

October 4th  Alternator brackets, copper contactor bars, installed Vetterman exhaust

October 5th  Installed LSE brain box, visit from University of Illinois Student Aircraft Builders

October 6th  Torque'd exhaust down, LSE mag hole cover, alternator bracket

October 9th  Engine control bracket

October 13th  Installed engine control panel bracket, throttle and mixture cable fitting

October 20th  Alternator install...finally, oil pressure line, engine breather tube

October 23rd  Finished alternator install, fuel lines

October 24th  Final installed fuel lines, fuel pump overflow/drain, fixed cabin heat muff

October 25th  Changed all tie wraps to Adel, safetied some stuff, ran carb & cabin heat cables

October 26th  Hooked up throttle and mixture cables and cabin heat, tightened controls

October 30th  Clamped cabin heat cable, re-routed fuel pump drain, made heat shield

 