October 2009

October 2nd  Fuel pressure wiring

October 3rd  Fuel level wiring, lots of mics. FWF stuff

October 5th  Manifold pressure fittings, landing light wiring, installed battery, tested some lights!

October 10th  Pulled wig-wag out, ran new wires for AeroLED's

October 11th  Made brackets for the right side AeroLED light

October 12th  Ran strobe wires in the wings, AeroLED right side install

October 16th  AeroLED install

October 17th  AeroLED's installed, and they work!

October 18th  RPM sender installed, started nav/strobe lights

October 19th  Nav/strobe lights

October 22nd  Installed wingtips

October 26th  Nav lights wired and powered, strobe power pack and wires

October 28th  Manifold pressure lines, installed strobe power supply

October 31st  Securing manifold pressure line, powered up the wing strobes

 

November 2009

September 2009