September 2007 Fuselage September 7th Fit and drilled wing root fairings, installed roll servo bracket September 8th Removed wings, started platenuts for wing root fairings September 9th Finished platenuts, covered wings, installed pitch servo mount September 10th Brought HS and elevators down from storage September 13th Drill elevator horns, clamped HS to fuselage September 15th Bolted HS to fuse, hung elevators, started on 'The List' September 16th Fit elevator push-pull tube, manual trim cable, and VS September 17th VS work September 22nd Finished VS install, fit rudder September 23rd Finished installing rudder and rudder stop September 24th Removed empennage, deburred holes, riveted F-781 to VS spar September 25th Finished riveting AP bracket, installed static ports, installed screen on fuel vents September 27th Vent line fittings, rudder pedal center brace, started strobe power pack install September 29th Installed strobe power pack, static lines, and the rudder cable exit fairings
|