September 2007 Fuselage

September 7th  Fit and drilled wing root fairings, installed roll servo bracket

September 8th  Removed wings, started platenuts for wing root fairings

September 9th  Finished platenuts, covered wings, installed pitch servo mount

September 10th  Brought HS and elevators down from storage

September 13th  Drill elevator horns, clamped HS to fuselage

September 15th  Bolted HS to fuse, hung elevators, started on 'The List'

September 16th  Fit elevator push-pull tube, manual trim cable, and VS

September 17th  VS work

September 22nd  Finished VS install, fit rudder

September 23rd  Finished installing rudder and rudder stop

September 24th  Removed empennage, deburred holes, riveted F-781 to VS spar

September 25th  Finished riveting AP bracket, installed static ports, installed screen on fuel vents

September 27th  Vent line fittings, rudder pedal center brace, started strobe power pack install

September 29th  Installed strobe power pack, static lines, and the rudder cable exit fairings

 