September 2009

September 3rd  Fuel line, lower baffle wires

September 7th  Plenum to baffle 'glass, started the air box, installed CHT leads

September 9th  Carb air box

September 12th  Fit plenum again, carb air box bracket and carb heat cable

September 13th  Secured the carb heat cable, safety'd the carb bowl

September 16th  Fuel flow power wire, CHT/EGT wiring and installation

September 19th  CHT/EGT wiring at the RDAC unit

September 20th  CHT/EGT wiring, installed oil cooler lines

September 21st  Plenum filler, last baffle bolt

September 22nd  LSI coils, oil temp, oil pressure wiring

September 24th  Redid the air box brackets, sanded the plenum

September 28th  Clamped air box brackets, routed spark plug wires from mag

 