September 2009 September 3rd Fuel line, lower baffle wires September 7th Plenum to baffle 'glass, started the air box, installed CHT leads September 9th Carb air box September 12th Fit plenum again, carb air box bracket and carb heat cable September 13th Secured the carb heat cable, safety'd the carb bowl September 16th Fuel flow power wire, CHT/EGT wiring and installation September 19th CHT/EGT wiring at the RDAC unit September 20th CHT/EGT wiring, installed oil cooler lines September 21st Plenum filler, last baffle bolt September 22nd LSI coils, oil temp, oil pressure wiring September 24th Redid the air box brackets, sanded the plenum September 28th Clamped air box brackets, routed spark plug wires from mag
|