9/6-14/2011

I've found, as so many others have that do internet build logs, that building ribs doesn't bring new situations that suite the needs of a worthy picture.  So for the last week, I've been busying making ribs 3 through 5.  Sanding and fitting sticks, epoxy, staples, remove staples, run the rib across the routing table is the routine.  I am enjoying it though...and I love the smell of saw dust!

Ribs 1-4 are done except trimming the leading and trailing edges, and rib 5 is ready for side 2 gussets, rib 6 is started, but not shown in the pics.

5.75 hours